50,000+ SKUs migrated in a 60-day ecommerce catalog move
A catalog migration at this scale can fail quietly. Missing images, broken variants, and incomplete attributes often surface only after launch. Acelerar moved more than 50,000 SKUs inside a 60-day window and reconciled the migrated catalog against the source data before sign-off.
Outcome at a glance
50,000+
SKUs migrated
A bulk catalog move completed inside the agreed project window.
60 days
Delivery window
The migration met every scheduled deadline.
99.8%
Data accuracy
Catalog records were reconciled before final sign-off.
40%
Lower cost
Cost savings compared with running the work through an in-house team.
The challenge
High-volume work with no room for silent errors
- Move more than 50,000 SKUs without losing product relationships, images, attributes, or category assignments.
- Keep the project inside a fixed 60-day deadline while maintaining day-to-day ecommerce operations.
- Create a repeatable QA process that could find incomplete records before the new catalog went live.
The operating plan
A controlled workflow, built around the source data
The team mapped source fields to the destination catalog before the first production import.
Products moved in controlled batches so failed rows and format issues could be corrected without delaying the full migration.
A final reconciliation checked record counts and critical fields against the source catalog before handoff.
“Acelerar handled our entire catalog migration (50,000+ SKUs) without a single missed deadline.”